Sewer System Expansion on the Texas Coast

Sewer System Expansion on the Texas Coast

Port O’Connor, Texas

Overview

 

The community of Port O’Connor, Texas, south of Victoria on West Matagorda Bay, has experienced growth in recent years. The vacuum or pneumatic sewer system installed in 2000 has been underperforming of late. The Port O’Connor Improvement District contracted Lynn Engineering to design a more robust vacuum sewer system with additional capacity to handle the recent expansion and projected growth in the future.

The Challenge

Vacuum/Pneumatic Sewer Systems are not widely used in Texas. They are typically reserved for flat areas with sandy soil and high groundwater tables, such as the coast. Many contractors are not intimately familiar with the system and its design.

Records of the existing system were incomplete, yet the new system needed to run parallel to the old system. This presented a design challenge as the system passes through alleyways and alongside existing infrastructure and utilities such as gas a telephone lines.

The community does not have a building code. There are buildings protruding into easements and rights-of-way, as well as decks built over alleys.

 

  • Design a two-mile vacuum sewer system with five different feed lines to replace old system in growing community.
  • Understand the design of the existing system and build new system alongside it to prevent rerouting of tie-ins and feed lines as much as possible
  • Ensure that the new system is functional not only for the needs of today, but that it will not soon become obsolete.

The Goals

The Solution

This project required an extensive amount of research. Records of the existing pneumatic system were incomplete. The engineer was able to locate the original construction plans for the system installed in 2020. Unfortunately, many changes were made in the field during construction, rendering the original construction plans almost unusable. The engineer then spent several days in the field during the design phase, walking down the lines and manually probing for the depth of the lines and documenting obstructions both above and below the ground. The engineer also noted where lots without homes or structures are along the route and where homes may have rainwater run-off routed to the wastewater system.

The Results

The final design includes considerations for the empty lots along the two-mile system and will allow for future development or expansion. It is built to handle increased capacity, but not overbuilt so as to hinder the pressure requirements of the vacuum system. During the construction phase, the engineer is on-site at least one full day each week to check progress, walk down the lines and answer any questions of the contractors as this pneumatic design is not typical for the region.

Testimonials

“Every one of our homes engineered by Lynn Engineering withstood Hurricane Harvey with no structural damage.”
Kyle Alston
TideWater Properties, LLC

Questions?

We Know the Landscape of the
Texas Gulf Coast & Local Communities
—We Can Help.

Our Case Studies

Leea Mercer

Leea Mercer, Administrative Assistant, provides admin support to ensure efficient operation of the office, answers phone calls, and supports visitors. Not only does she carry out administrative duties such as filing, typing, copying, binding, scanning, etc., but she is the smiling face and the warm welcome you encounter entering the Edna office.

Continue reading

John D. Mercer

John D. Mercer is the founder of John D. Mercer & Associates, and since the Lynn Engineering acquisition, he maintains the duties of managing the operations of its Edna office.

Continue reading

Jeff Laney

Jeff Laney is a Project Representative at Lynn Engineering. He serves as a liaison between the client and engineer. He participates in all aspects of construction jobs, from pre-construction to completion, performing inspections and maintaining integrity and compliance at job sites. He also performs Windstorm Inspections on new construction homes.

Continue reading

Dale Mercer

Dale Mercer, lead civil designer/project coordinator, prepares designs and drawings, tracks and coordinates job schedules, and coordinates the work of other designers and draftsmen.

Continue reading

Christina Mulenex

Christina Mulenex is a CAD drafter for John D. Mercer & Associates and Lynn Engineering. Christina has been with the company for 27 years. She graduated from Victoria College with an Associates of Applied Science in Drafting Technology.

Continue reading

Brian M. Kramer, P.E.

Brian Montgomery Kramer, is a Professional Civil Engineer for our Edna office and he works with several of the municipalities designing underground utilities. Brian joined the company in 2019. Prior to that, he spent six years working for a construction company as a project manager.

Continue reading